Prefer to send a drawing? Use the full RFQ form, email xcwystamping@xcwybj.com or message WhatsApp.
All images below are existing XCWY assets from the factory, production equipment, quality areas or representative custom parts.








Include material, thickness, quantity, critical dimensions, finish and target date. We will review the manufacturing route before quoting.
Projects from the Nanpi plant
Each case study describes what was supplied, how the process route was planned and how quality was controlled — without inventing results we cannot evidence.
A European OEM consolidated powder-coated control enclosures into a single XCWY route. Drawing review covered bend sequence, hardware order and finish masking before tooling; cabinets are inspected for door gap, squareness, coating thickness and hardware before packing.
After first-article approval on progressive and compound tooling, a US partner runs recurring stamped production on our 25–400 ton presses, with batch-tied inspection records issued to the purchase specification.
Beyond projects, our resources page carries the reference material engineers search for when designing formed metal parts — draw ratio, bend allowance, DFM and supplier verification.
| Supply model | Build-to-print custom manufacturing |
| Programme stages | Review, tooling, sample approval, repeat production |
| Quality basis | Drawing, purchase specification and approved sample |
| Quality system | ISO 9001:2015 · 34025Q30296R0S |
Yes — customer names and drawings are kept confidential unless the customer agrees to be named. The process, quality controls and typical part families are described factually.
Send your drawing and ask for comparable project references. We will describe relevant similar work without sharing restricted details.
Yes. An engineering review checks process route, material, tooling implications and inspection requirements before a quotation is prepared.
Production is managed under ISO 9001:2015. Incoming material, first article, in-process and final inspection requirements are defined by the drawing and purchase specification.