The housing the cells deserve

Metal Enclosures & Racks for Energy Storage

Outdoor BESS enclosures, battery rack components and PCS housings — galvanized and stainless builds with gasket-channel sealed doors, weather-rated coating and CMM-verified door fit.

Sealing designed into the forming, not applied later

Door frames are formed with the gasket channel in the same press-brake operation, so the seal path is consistent along all four sides — the difference between a weatherproof cabinet and a claim on paper.

Coating specified against the site

Two-coat outdoor powder systems over galvanized substrate, with stainless 304/316L options for coastal installations. Coating thickness is verified per batch and shipped with the readings.

Door fit checked on the machine, not the floor

Every door frame is CMM-checked for squareness and hole position before finishing — a bad door frame is the fastest way to ruin a production run downstream.

Specifications

Primary materialsGalvanized steel, SS304, SS316L, CR steel
Typical processesLaser cutting, CNC bending, MIG/laser welding, powder coating
Enclosure sizesBuilt to drawing; press brake to 3,200 mm bed
SealingGasket-channel formed doors, continuous foam seals
FinishingTwo-coat outdoor powder system over galvanized base
DocumentationEN 10204 material certificates, CMM reports, coating readings
Quality basisISO 9001:2015 · registration 34025Q30296R0S

FAQ

What material do you use for outdoor BESS enclosures?

Galvanized steel as standard, with SS304 or SS316L options for coastal and high-humidity sites. Sheet gauges run 0.3–6.0 mm with EN 10204 certificates.

Can you hold IP54/IP55 sealing?

Yes. Gasket-channel formed door frames with continuous foam seals are part of our standard route, and door fit is CMM-checked on every unit.

What is the largest enclosure you can build?

With a 3,200 mm press-brake bed and 12,000 W laser, we fabricate enclosures up to roughly 3,000 mm in the bending direction.

Do you build multiple sizes in one programme?

Yes — our case study covered three sizes sharing one tooling and finish line, which keeps per-unit cost down.

What is your minimum order and lead time?

MOQ from 1 pc; first articles typically 4 weeks from drawing approval. Quotations within 3 business hours.